838
Comment: update review queue
|
839
typo
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* Can be done after or party during issue667 and issue668, which use the new design | * Can be done after or partly during issue667 and issue668, which use the new design |
Review queue
http://issues.fast-downward.org/issue26: integrate preprocessor in search code (Gabi)
http://issues.fast-downward.org/issue644: new design for merge strategies (code review, Silvan)
- Has been merge already
- Can be done after or partly during issue667 and issue668, which use the new design
http://issues.fast-downward.org/issue629: task interface for pruning techniques (code review, Florian)
- Jendrik already looked at the code.
- Martin planned to have a look as well.
http://issues.fast-downward.org/issue509: task interface next steps (discuss long-term plan, Florian)
http://issues.fast-downward.org/issue667: Integrate SCCs based merge strategy (code review, Silvan)
http://issues.fast-downward.org/issue668: Integrate dynamic MIASM merge strategy (code review, Silvan)